(1)
Cost and Time Optimization In Retaining Wall Construction Through The Application of Value Engineering on The Bendung-Bantengan Road Section, Mojokerto District. devotion 2025, 6 (3), 280-290. https://doi.org/10.59188/devotion.v6i3.25436.