“Cost and Time Optimization In Retaining Wall Construction Through The Application of Value Engineering on The Bendung-Bantengan Road Section, Mojokerto District”. 2025. Devotion : Journal of Research and Community Service 6 (3): 280-90. https://doi.org/10.59188/devotion.v6i3.25436.