“Analysis of The Acceleration of Time and Cost of Implementing Building Construction Projects Using The Critical Path Method (CPM) Method” (2023) Devotion : Journal of Research and Community Service, 4(2), pp. 336–346. doi:10.36418/dev.v4i2.388.