[1]
“Analysis of The Acceleration of Time and Cost of Implementing Building Construction Projects Using The Critical Path Method (CPM) Method”, devotion, vol. 4, no. 2, pp. 336–346, Feb. 2023, doi: 10.36418/dev.v4i2.388.