[1]
“Performance Evaluation of Time and Cost In The Bungur-Kedoyo Tulungagung Road Construction Project Using The Earned Value Method”, devotion, vol. 6, no. 1, pp. 43–57, Jan. 2025, doi: 10.59188/devotion.v6i1.25402.