[1]
“Cost and Time Optimization In Retaining Wall Construction Through The Application of Value Engineering on The Bendung-Bantengan Road Section, Mojokerto District”, devotion, vol. 6, no. 3, pp. 280–290, Mar. 2025, doi: 10.59188/devotion.v6i3.25436.